Latest news:
Archives

CENTRICA STORAGE

01 April, 2015

CENTRICA STORAGE

Our sister company, Oil & Gas Systems, has delivered an Ariel JGA/2 electric motor driven compressor package for Centrica Storage to the Easington processing Station. The system is designed to be remotely operated via the plant DCS and will recover vent gas that was previously lost.  

The project presented several technical challenges that were successfully overcome, not least of which was a strictly limited allowable noise level.  OGM and OGS will provide ongoing support to Centrica during the life of the project.

;